Change font size: A A A
Print this page

Groton Wind Farm

Contact

Please contact Project Developer Ed Cherian with any questions on the project: 603-440-3127, echerian@avangrid.com.

Project Location

The proposed Groton Wind Farm is situated along two ridge features in the town of Groton, New Hampshire in Grafton County. Both ridges are northeast/southwest oriented and range in peak elevation from 1,850 to 2,300 feet. The site is rural and located entirely on private land parcels that are set back from residences, roads and other public areas.

Back to Groton Wind Home


Application Documents
Cover Letter of the Application and Appearance March 26, 2010 pdf icon 168 KB
Table of Contents March 26, 2010 pdf icon 77 KB
Executive Summary March 26, 2010 pdf icon 86 KB
Groton Wind SEC Application March 26, 2010 pdf icon 1.8 MB
Prefiled Testimonies and Exhibits Supporting Application March 26, 2010 pdf icon 1.8 MB


Appendices
Appendix 1 - Standard Dredge and Fill Permit Application March 26, 2010 pdf icon 160 MB
Appendix 2 - Alteration of Terrain Permit Application March 26, 2010 pdf icon 162 MB
Appendix 3 - 401 Water Quality Certification Request March 26, 2010 pdf icon 608 KB
Appendix 4 - List of Primary Meetings March 26, 2010 pdf icon 53 KB
Appendix 5 - Town of Groton Agreement March 26, 2010 pdf icon 41 KB
Appendix 6 - North Country Comprehensive Economic Development Strategy March 26, 2010 pdf icon 24.4 MB
Appendix 7 - Economic Resurgence in the Northern Forest, Sustainable Economy Initiative March 26, 2010 pdf icon 4 MB
Appendix 8 - FAA 7460-1 Applications March 26, 2010 pdf icon 2 MB
Appendix 9 - Gamesa G87 - 2.0MW Product Brochure March 26, 2010 pdf icon 254 KB
Appendix 10 - Lempster SPCC, CH2M Hill March 26, 2010 pdf icon 2.5 MB
Appendix 11 - Gamesa G87 - 2.0MW Specifications March 26, 2010 pdf icon 426 KB
Appendix 12 - Utility Wind Integration - State of the Art March 26, 2010 pdf icon 287 KB
Appendix 13 - PSNH Feasibility Study March 26, 2010 pdf icon 41 KB
Appendix 14 - Gantt Timeline Chart March 26, 2010 pdf icon 33 KB
Appendix 15 - Southern Tier Express Route Survey March 26, 2010 pdf icon 78 KB
Appendix 16 - Avangrid Renewables, Inc. Avian and Bat Protection Plan March 26, 2010 pdf icon 3 MB
Appendix 17 - Work Plan for Avian and Bat Studies March 26, 2010 pdf icon 1 MB
Appendix 18 - USFWS and NH F&G Meeting Notes and Study Request March 26, 2010 pdf icon 1.1 MB
Appendix 19 - Raptor Survey Protocols, Peregrine Falcon Work Plan and Acoustic Study Plan March 26, 2010 pdf icon 66 KB
Appendix 20 - Wildlife Habitat Assessment Report March 26, 2010 pdf icon 9.9 MB
Appendix 21 - State of NH and Federal Water Resource Agency Meeting Minutes March 26, 2010 pdf icon 143 KB
Appendix 22 - Avangrid Renewables, Inc. Operational Projects in the US and Europe March 26, 2010 pdf icon 12 KB
Appendix 23 - Documentation of Written Notification to Town of Groton March 26, 2010 pdf icon 2 MB
Appendix 24 - Visual Impact Assessment and Supplemental Memorandum March 26, 2010 pdf icon 214 MB
Appendix 25 - Shadow Flicker Report March 26, 2010 pdf icon 11.9 MB
Appendix 26 - Archaeological Resources Study Report March 26, 2010 pdf icon 23.1 MB
Appendix 27 - Wind Energy Fact Sheet - Comparative Air Emissions of Wind and Other Fuels March 26, 2010 pdf icon 53 KB
Appendix 28 - Bird and Bat Risk Assessment March 26, 2010 pdf icon 6.3 MB
Appendix 29 - Summer and Fall Wildlife Surveys at Tenney Mountain, NH March 26, 2010 pdf icon 307 KB
Appendix 30 - Spring 2008 Radar Survey Report March 26, 2010 pdf icon 5.6 MB
Appendix 31 - Fall 2008 Radar Survey Report March 26, 2010 pdf icon 5.7 MB
Appendix 32 - 2009 Spring, Summer and Fall Avian and Bat Surveys March 26, 2010 pdf icon 3.9 MB
Appendix 33 - Summer and Early Fall 2009 Peregrine Falcon Use Surveys March 26, 2010 pdf icon 8.1 MB
Appendix 34 - Avangrid Renewables, Inc. Statement of EHS Policy - People and the Environment First March 26, 2010 pdf icon 33 KB
Appendix 35 - Sound Level Assessment Report and Addendum March 26, 2010 pdf icon 3.9 MB
Appendix 36 - Economic Impact of the Proposed Groton Wind 50 MW Wind Power Project in Groton, NH March 26, 2010 pdf icon 4.1 MB
Appendix 37 - The Impact of Wind Power Projects on Residential Property Values in the US - A Multi-Site Hedonic Analysis March 26, 2010 pdf icon 3.8 MB


Discovery Documents
Project Area Form 01/18/11
Page 1 - 66 pdf icon 8.6 MB
Page 67 - 88 pdf icon 7.1 MB
Page 89 - 92 pdf icon 1.5 MB
Page 93 - 106 pdf icon 5.3 MB
Page 107 - 126 pdf icon 7.5 MB
Page 127 - 143 pdf icon 5.7 MB
Large format map of the Project Area and APE pdf icon 9.2 MB